我要色综合色综合久久,欧美大黑BBB,精品无码国产污污污免费,18禁裸体动漫美女无遮挡网站

Service hotline:

0315-5913666

+86-18931500255

Domestic > Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project
呂家坨(選用).jpg
  • 呂家坨(選用).jpg

Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project

Type: Coking coal preparation plant

Scale: 3.6Mt/a

Contracting mode: partial contracting and renovation projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, while the fine coal slurry is sorted by a flotation machine. The existing system is used for flotation, pressure filtration, and concentration, and the washing water is closed loop, which is environmentally friendly and energy-saving.